2016 International Conference on Artificial Intelligence and Computer Science(AICS2016) |
大陸地區Shenzhen, China |
Minimising total weighted earliness and tardiness for parallel batch-processing machines with incompatible job families |
第三作者 |
2016.11.25 ~ 2016.11.27 |
2016 International Conference on Artificial Intelligence and Computer Science(AICS2016) |
大陸地區Shenzhen, China |
A Bi-criterion simulated annealing method for a single batch-processing machine scheduling problem with dynamic job release times |
第二作者 |
2016.11.25 ~ 2016.11.27 |
2016 International Conference on Business and Information (BAI 2016) |
日本Nagoya, Japan |
A CONSTRAINED PROGRAMMING MODEL FOR TOUR-GUIDE SCHEDULING OF FIELD TRIP TO MINIMIZE THE MAKESPAN |
第三作者 |
2016.07.03 ~ 2016.07.05 |
2016 International Conference on Business and Information (BAI 2016) |
日本Nagoya, Japan |
A BI-CRITERION SCHEDULING FOR STERILIZATION OPERATION IN A PROFESSIONAL DISINFECTION, STERILIZATION AND WASTE DISPOSAL SERVICES |
第二作者 |
2016.07.03 ~ 2016.07.05 |
2016系統性創新研討會 |
中華民國桃園市中壢區 |
半導體積體電路封裝廠封膠壓模製程之排程研究 |
第二作者 |
2016.01.23 ~ 2016.01.23 |
中國工業工程學會 104 年度年會暨學術研討會 |
中華民國台中市 |
運用啟發式演算法解決LED晶粒分類揀選之排程問題 |
第三作者 |
2015.12.12 ~ 2015.12.12 |
2015 全國管理實務暨學術研討會 |
中華民國桃園市中壢區 |
醫療服務體系下重覆使用醫療器械之滅菌作業的排程研究 |
第二作者 |
2015.05.07 ~ 2015.05.07 |
2015 International Conference on Information Management (ICIM 2015) |
大陸地區GUILIN , CHINA |
A mixed integer programming method for the health examination center scheduling problems with sequence-dependent transportation time |
第二作者 |
2015.02.28 ~ 2015.03.02 |
International Conference on Economics and Management Engineering [ICEME 2014] |
大陸地區Hangzhou, China |
A simulated annealing algorithm to minimize maximum lateness for a batch-processing machine scheduling problem |
第二作者 |
2014.10.18 ~ 2014.10.19 |
2014 International Conference on Computational Intelligence and Industrial Engineering (CIIE 2014) |
大陸地區Shenzhen |
Improve the supplementary-service in hotel by scheduling approach |
第三作者 |
2014.07.29 ~ 2014.07.30 |
2014全國管理實務暨學術研討會 |
中華民國桃園縣中壢市 |
半導體製造中單片式旋轉清洗與氧化爐管機台的兩階段製程之排程研究 |
第三作者 |
2014.05.08 ~ 2014.05.08 |
2014全國管理實務暨學術研討會 |
中華民國桃園縣中壢市 |
半導體積體電路最終測試廠非等容量平行預燒烤爐製程以總合加權遲交時間最小化為目標之排程研究 |
第二作者 |
2014.05.08 ~ 2014.05.08 |
2014全國管理實務暨學術研討會 |
中華民國桃園縣中壢市 |
單製程等效平行機台之排程研究 |
第一作者 |
2014.05.08 ~ 2014.05.08 |
2014全國管理實務暨學術研討會 |
中華民國桃園縣中壢市 |
單機具有釋放時間以及順序相依整備時間之排程問題研究 |
第一作者 |
2014.05.08 ~ 2014.05.08 |
The International Symposium on Applied Engineering, Technical Management, and Innovation 2013(AETMI 2013) |
大陸地區Hangzhou, China |
Scheduling Two-stage Flow Shop for Single Wafer Spin Cleaner and Furnace Operation in Semiconductor Manufacturing |
第一作者 |
2013.10.18 ~ 2013.10.20 |
2013全國管理實務暨學術研討會 |
中華民國桃園縣中壢市 |
同時雙向推進機制的分散式平行運算分枝界限法用於解決單機排程問題之研究 |
第二作者 |
2013.05.16 ~ 2013.05.16 |
2013全國管理實務暨學術研討會 |
中華民國桃園縣中壢市 |
健康檢查中心之排程研究 |
第一作者 |
2013.05.16 ~ 2013.05.16 |
2013全國管理實務暨學術研討會 |
中華民國桃園縣中壢市 |
發光二極體(LED)製造廠中晶粒分類揀選製程之排程研究 |
第一作者 |
2013.05.16 ~ 2013.05.16 |
IIE Asian Conference 2012 |
新加坡共和國Singapore, Singapor |
Particle swarm optimization algorithms to hybrid flow shop scheduling problem with sequence-dependent setup times |
第二作者 |
2012.06.28 ~ 2012.06.30 |
IIE Asian Conference 2012 |
新加坡共和國Singapore, Singapor |
Scheduling of LED chip sorting sequencing model in LED manufacturing |
第二作者 |
2012.06.28 ~ 2012.06.30 |
2011 2nd International Conference on Mechanical, Industrial, and Manufacturing Technologies (MIMT 2011) |
SingaporeSingapore |
Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks |
第二作者 |
2011.02.26 ~ 2011.02.28 |
2011 2nd International Conference on Mechanical, Industrial, and Manufacturing Technologies (MIMT 2011) |
SingaporeSingapore |
Minimizing total weighted tardiness on parallel batch-processing machine scheduling problems with varying machine capacities |
第一作者 |
2011.02.26 ~ 2011.02.28 |
The 2010 International Conference on Education Technology and Computer (ICETC 2010) |
ChinaShanghai |
Bi-direction branch and bound method to solve the single machine total weighted completion time problem with job release times |
第一作者 |
2010.06.22 ~ 2010.06.24 |
The 2010 International conference on Mechanical, Industrial, and Manufacturing Technologies (MIMT 2010) |
ChinaSanya |
A restricted simulated annealing for hybrid flow-shop scheduling with multiprocessor tasks |
第一作者 |
2010.01.22 ~ 2010.01.24 |
The 20th International Conference on Production Research (ICPR 20) |
NATCHN-中國大陸上海市 |
Solving single batch-processing machine using iterated heuristic |
第二作者 |
2009.08.02 ~ 2009.08.06 |
2009第六屆企業經營管理研討會 |
NATTWN-台灣,中華民國中壢市 |
考量工作具有釋放時間與截止時間之單機排程研究 |
第二作者 |
2009.05.21 ~ 2009.05.21 |
2009資訊管理實務研討會 |
NATTWN-台灣,中華民國中壢市 |
探討TQM與TPM之應用對供應鏈建構與執行績效之影響 |
第三作者 |
2009.05.08 ~ 2009.05.08 |
2008 International Conference of Production and Operation Management |
NATCHN-中國大陸廈門 |
Minimizing the makespan for different volume parallel batch-processing machines problem with release times and job sizes |
第二作者 |
2008.12.08 ~ 2008.12.10 |
九十五年年度中國工業工程學會年會 |
台灣,中華民國台中 |
單一批次加工機器考量多評估準則之生產排程研究 |
第一作者 |
2006.12.23 ~ 2006.12.23 |
九十四年年度中國工業工程學會年會 |
中華民國新竹市 |
同時考量具有不同釋放時間與順序相依整備時間特性之單機排程問題研究 |
第一作者 |
2005.12.17 ~ 2005.12.17 |
九十四年年度中國工業工程學會年會 |
中華民國新竹市 |
應用基因演算法求解單一預燒機台以總加權遲交時間最小化的排程問題 |
第二作者 |
2005.12.17 ~ 2005.12.17 |
The 6th Asia Pacific Industrial Engineering & Management Conference 2005 & The 8th Asia-Pacific Division Meeting of the International Foundation of Production Research |
PhilippinesMakati City, Metro Manila |
Exact algorithm for bi-criteria single-machine scheduling problems |
第一作者 |
2005.12.04 ~ 2005.12.07 |