2016 International Conference on Artificial Intelligence and Computer Science(AICS2016) |
大陆地区Shenzhen, China |
Minimising total weighted earliness and tardiness for parallel batch-processing machines with incompatible job families |
第三作者 |
2016.11.25 ~ 2016.11.27 |
2016 International Conference on Artificial Intelligence and Computer Science(AICS2016) |
大陆地区Shenzhen, China |
A Bi-criterion simulated annealing method for a single batch-processing machine scheduling problem with dynamic job release times |
第二作者 |
2016.11.25 ~ 2016.11.27 |
2016 International Conference on Business and Information (BAI 2016) |
日本Nagoya, Japan |
A CONSTRAINED PROGRAMMING MODEL FOR TOUR-GUIDE SCHEDULING OF FIELD TRIP TO MINIMIZE THE MAKESPAN |
第三作者 |
2016.07.03 ~ 2016.07.05 |
2016 International Conference on Business and Information (BAI 2016) |
日本Nagoya, Japan |
A BI-CRITERION SCHEDULING FOR STERILIZATION OPERATION IN A PROFESSIONAL DISINFECTION, STERILIZATION AND WASTE DISPOSAL SERVICES |
第二作者 |
2016.07.03 ~ 2016.07.05 |
2016系统性创新研讨会 |
中华民国桃园市中坜区 |
半导体积体电路封装厂封胶压模制程之排程研究 |
第二作者 |
2016.01.23 ~ 2016.01.23 |
中国工业工程学会 104 年度年会暨学术研讨会 |
中华民国台中市 |
运用启发式算法解决LED晶粒分类拣选之排程问题 |
第三作者 |
2015.12.12 ~ 2015.12.12 |
2015 全国管理实务暨学术研讨会 |
中华民国桃园市中坜区 |
医疗服务体系下重复使用医疗器械之灭菌作业的排程研究 |
第二作者 |
2015.05.07 ~ 2015.05.07 |
2015 International Conference on Information Management (ICIM 2015) |
大陆地区GUILIN , CHINA |
A mixed integer programming method for the health examination center scheduling problems with sequence-dependent transportation time |
第二作者 |
2015.02.28 ~ 2015.03.02 |
International Conference on Economics and Management Engineering [ICEME 2014] |
大陆地区Hangzhou, China |
A simulated annealing algorithm to minimize maximum lateness for a batch-processing machine scheduling problem |
第二作者 |
2014.10.18 ~ 2014.10.19 |
2014 International Conference on Computational Intelligence and Industrial Engineering (CIIE 2014) |
大陆地区Shenzhen |
Improve the supplementary-service in hotel by scheduling approach |
第三作者 |
2014.07.29 ~ 2014.07.30 |
2014全国管理实务暨学术研讨会 |
中华民国桃园县中坜市 |
半导体制造中单片式旋转清洗与氧化爐管机台的兩阶段制程之排程研究 |
第三作者 |
2014.05.08 ~ 2014.05.08 |
2014全国管理实务暨学术研讨会 |
中华民国桃园县中坜市 |
半导体积体电路最终测试厂非等容量平行预烧烤炉制程以总合加权迟交时间最小化为目标之排程研究 |
第二作者 |
2014.05.08 ~ 2014.05.08 |
2014全国管理实务暨学术研讨会 |
中华民国桃园县中坜市 |
单制程等效平行机台之排程研究 |
第一作者 |
2014.05.08 ~ 2014.05.08 |
2014全国管理实务暨学术研讨会 |
中华民国桃园县中坜市 |
单机具有释放时间以及顺序相依整备时间之排程问题研究 |
第一作者 |
2014.05.08 ~ 2014.05.08 |
The International Symposium on Applied Engineering, Technical Management, and Innovation 2013(AETMI 2013) |
大陆地区Hangzhou, China |
Scheduling Two-stage Flow Shop for Single Wafer Spin Cleaner and Furnace Operation in Semiconductor Manufacturing |
第一作者 |
2013.10.18 ~ 2013.10.20 |
2013全国管理实务暨学术研讨会 |
中华民国桃园县中坜市 |
同时双向推进机制的分布式平行运算分枝界限法用于解决单机排程问题之研究 |
第二作者 |
2013.05.16 ~ 2013.05.16 |
2013全国管理实务暨学术研讨会 |
中华民国桃园县中坜市 |
健康检查中心之排程研究 |
第一作者 |
2013.05.16 ~ 2013.05.16 |
2013全国管理实务暨学术研讨会 |
中华民国桃园县中坜市 |
发光二极管(LED)制造厂中晶粒分类拣选制程之排程研究 |
第一作者 |
2013.05.16 ~ 2013.05.16 |
IIE Asian Conference 2012 |
新加坡共和国Singapore, Singapor |
Particle swarm optimization algorithms to hybrid flow shop scheduling problem with sequence-dependent setup times |
第二作者 |
2012.06.28 ~ 2012.06.30 |
IIE Asian Conference 2012 |
新加坡共和国Singapore, Singapor |
Scheduling of LED chip sorting sequencing model in LED manufacturing |
第二作者 |
2012.06.28 ~ 2012.06.30 |
2011 2nd International Conference on Mechanical, Industrial, and Manufacturing Technologies (MIMT 2011) |
SingaporeSingapore |
Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks |
第二作者 |
2011.02.26 ~ 2011.02.28 |
2011 2nd International Conference on Mechanical, Industrial, and Manufacturing Technologies (MIMT 2011) |
SingaporeSingapore |
Minimizing total weighted tardiness on parallel batch-processing machine scheduling problems with varying machine capacities |
第一作者 |
2011.02.26 ~ 2011.02.28 |
The 2010 International Conference on Education Technology and Computer (ICETC 2010) |
ChinaShanghai |
Bi-direction branch and bound method to solve the single machine total weighted completion time problem with job release times |
第一作者 |
2010.06.22 ~ 2010.06.24 |
The 2010 International conference on Mechanical, Industrial, and Manufacturing Technologies (MIMT 2010) |
ChinaSanya |
A restricted simulated annealing for hybrid flow-shop scheduling with multiprocessor tasks |
第一作者 |
2010.01.22 ~ 2010.01.24 |
The 20th International Conference on Production Research (ICPR 20) |
NATCHN-中国大陆上海市 |
Solving single batch-processing machine using iterated heuristic |
第二作者 |
2009.08.02 ~ 2009.08.06 |
2009第六届企业经营管理研讨会 |
NATTWN-台湾,中华民国中坜市 |
考量工作具有释放时间与截止时间之单机排程研究 |
第二作者 |
2009.05.21 ~ 2009.05.21 |
2009资讯管理实务研讨会 |
NATTWN-台湾,中华民国中坜市 |
探讨TQM与TPM之应用对供应链建构与执行绩效之影响 |
第三作者 |
2009.05.08 ~ 2009.05.08 |
2008 International Conference of Production and Operation Management |
NATCHN-中国大陆厦门 |
Minimizing the makespan for different volume parallel batch-processing machines problem with release times and job sizes |
第二作者 |
2008.12.08 ~ 2008.12.10 |
九十五年年度中国工业工程学会年会 |
台湾,中华民国台中 |
单一批次加工机器考量多评估准则之生产排程研究 |
第一作者 |
2006.12.23 ~ 2006.12.23 |
九十四年年度中国工业工程学会年会 |
中华民国新竹市 |
同时考量具有不同释放时间与顺序相依整备时间特性之单机排程问题研究 |
第一作者 |
2005.12.17 ~ 2005.12.17 |
九十四年年度中国工业工程学会年会 |
中华民国新竹市 |
应用基因算法求解单一预烧机台以总加权迟交时间最小化的排程问题 |
第二作者 |
2005.12.17 ~ 2005.12.17 |
The 6th Asia Pacific Industrial Engineering & Management Conference 2005 & The 8th Asia-Pacific Division Meeting of the International Foundation of Production Research |
PhilippinesMakati City, Metro Manila |
Exact algorithm for bi-criteria single-machine scheduling problems |
第一作者 |
2005.12.04 ~ 2005.12.07 |